1. 10-15 feet in length. Four controlled zones.
2. All benefits of LBT III.
3. Replaces the entire pre-heat section on of the sintering furnace.
4. Brings the part temperature to 1000+°C (1830+°F).
5. Parts are metallurgically fully clean and ready to be sintered.
6. 40% - 50% increase in production rate.
7. 30% - 40% decrease in cost of energy and atmosphere.